Some La Jolla streets have already been resurfaced; others will be completed before summer’s end.
Nine streets across La Jolla are on a list, with several more in Carmel Valley, released by San Diego City Council President Joe LaCava for repaving.
The streets will be resurfaced with an asphalt overlay during the summer, though some, including Jenner Street in The Village, have already been completed.
City of San Diego crews will carry out the work from 7:30 am to 4 pm weekdays. Construction notices will be distributed about five days prior to construction.
The La Jolla streets listed are:
- Cliffridge Avenue from Cliffridge Lane to the end of the cul-de-sac
- Country Club Drive at Mimulus Way
- Jenner Street from Prospect Street to Coast Boulevard
- Lookout Drive from Soledad Avenue to Boulevard Place
- Ludington Place from Ludington Lane to Soledad Avenue
- Mimulus Way at Country Club Drive
- Olivet Lane from Prospect Place to the end of the alley
- Prestwick Drive from Prestwick Court to Inverness Court
- Soledad Avenue from Hillside Drive to Lookout Drive
© lajolla.ca
