The city of San Diego Transportation Department will layer slurry seal on 22 La Jolla roads as part of a larger repair and resurfacing effort.
Nearly two dozen streets in La Jolla are set to receive slurry seal, a road resurfacing method to slow street deterioration, beginning Jan 14 through the end of the month.
The La Jolla streets to get slurry seal are (specific blocks are not specified):
- Candlelight Drive
- Corral WayÂ
- Cottontail LaneÂ
- Exchange Place
- Fay Avenue
- Germaine Lane
- Hidden Valley Road
- High Avenue
- John Jay Hopkins Drive
- Ladybird Lane
- La Jolla Boulevard
- La Jolla Rancho Road
- Olivet Street
- Paseo Dorado
- Prospect Place
- Rutgers RoadÂ
- Van Nuys Street
- Via Maria
- Via SienaÂ
- Via ViestaÂ
- Vickie DriveÂ
- Winamar AvenueÂ
Detailed dates were not immediately available.
Â
© lajolla.ca